Fire Wafer Butterlfy Valve

Our factory are good at machining,sample or drawing will be welcome. We always try to reduce the cost to increase value for customer.

Product Details

Our factory are good at machining,sample or drawing will be welcome.

We always try to reduce the cost to increase value for customer.

Product Details

 

Materialcw614n,cw617n,Cuzn40Pb2 brass 
Size1/2"-1" 
Mediawater,steam,gas 
Technicforged,polishing,galvanized,nickel plated 
Nominal pressure1.6Mpa (200psi) 
Package
Packed by polybag/small box/carton/pallets 
Working temperature0° C≤ T≤ 80° C 
Usagepressure reducing valve for boilers,water heaters,central air conditioning,etc.
MarketEurope,America,etc. 
Samplesavailable
Model No.HQ-4515
Threading for waterworksISO228/1


图片 1


In order to ensure your requirement for usage, please explain in detail in your order: type, specification, material, nominal pressure. working pressure and temperature used, maximum flow rate. 

For the convenience usage of consumers, our company can provide flange and bolts completed with valve, and will provide wearing parts according to the requirement of consumers. In selection of product types. consumer can present his requirement for product materials, connection standard end technical data and give clear declaration in your contract.

Our company also can carry out study and development on new product according to the requirement of consumer.

our company

图片 7

image

 

 

Packaging & Shipping

1. Shrink bag --> 2. Small Box --> 3. Carton  -->  4. Strong Plywood Case


We have a skilled Dispatch Dept. Before shipment, they will pick up and check our customers' products one by one. Besides, we use export carton standard or according to customers' requirement.



FAQ

Q1: What shipping ways our use?

A4:Generally speaking, we will use UPS or DHL to ship the products. Our customers can reach the 

products within 3 days.If our customers do not need them urgently, we will also use Fedex and TNT.If the products are of heavy weight and large volumn, we will ship them by sea. This way can save 

our customers a lot of money. 

 

Q2:Who are our main customers?

 

A5:HP, Samsung, Jabil Group,Lexmark,Flextronic Group. 

 

Q3:What materials can you handle?

A6:Brass,bronze,copper,stainless steel, steel,aluminum,titanium And plastic.

 

Q4:How Long is the Delivery for Your Industrial Part? 

A7:Generally speaking, it will take us 15 working days for machining parts and 25 working days for 

the for stamping parts products. But we will shorten our lead time according to customers' demands

 if we are able to.

 

 


Inquiry